Just to mention that a full track layout and support is now underway, Ronaldo has started the construction work for the base
and is using several lengths of 8x2 rough joinery timber to machine and turn, hopefully the frame will be ready within a fornight.
Chris is going to organise the boards to be cnc to draft drawings that have being produced, pictures of this build and further updates will be posted as and when
Track layout size is 14ft x 8ft made up of 2x 8'x4' and 2x 8'x3'
Frame is 4x2 dressed and moulded and tennoned to locate into 6 moulded turned 4x4 legs
The legs and rails are to be bolted to each other to allow ease of build and dismantle
and is using several lengths of 8x2 rough joinery timber to machine and turn, hopefully the frame will be ready within a fornight.
Chris is going to organise the boards to be cnc to draft drawings that have being produced, pictures of this build and further updates will be posted as and when
Track layout size is 14ft x 8ft made up of 2x 8'x4' and 2x 8'x3'
Frame is 4x2 dressed and moulded and tennoned to locate into 6 moulded turned 4x4 legs
The legs and rails are to be bolted to each other to allow ease of build and dismantle