Can anyone give me advice on how to lift my track to the ceiling.
It is on a plywood baseboard; It is heavy: 70 - 100kg; It has to go up 140 cm; I have lots of pulleys: 10 doubles and 6 triples and one or two extra rated for 8 mm rope.
I'm looking for a good pulley and rope design that would minimise rope usage, probably with 5 or 6 anchor points on the table