The rebuild of NERCS track is now entering it`s final stages.
Ron has machined the legs & built the frame out of softwood . He finished them off with a lovely varnish.
There was no expense spared on the main boards.
He has bought in birchwood ply & cut it to size.
Six boards in total which securely biscuit together, with no bumps or ridges anywhere.
The two central boards are changeable so we can run a NASCAR track.
New Chris developed software for the track design,& the boards went into a factory for CNC routing this week.
The factory has done a splendid job of the routing.
Ron has now painted the boards & shipped them over to NERCS for copper taping & wiring.
Here`s the first photos of the track going up at NERCS.
Cheers,
Kev.
One half of the frame. Notice the "split" leg.
The full frame & legs. Colour co-ordinated for ease of construction.
The boards go on.
Ron has machined the legs & built the frame out of softwood . He finished them off with a lovely varnish.
There was no expense spared on the main boards.
He has bought in birchwood ply & cut it to size.
Six boards in total which securely biscuit together, with no bumps or ridges anywhere.
The two central boards are changeable so we can run a NASCAR track.
New Chris developed software for the track design,& the boards went into a factory for CNC routing this week.
The factory has done a splendid job of the routing.
Ron has now painted the boards & shipped them over to NERCS for copper taping & wiring.
Here`s the first photos of the track going up at NERCS.
Cheers,
Kev.
One half of the frame. Notice the "split" leg.

The full frame & legs. Colour co-ordinated for ease of construction.

The boards go on.

