Joined
·
6,770 Posts
Looking at the question differently, I read:
Is there anyway of sinking the track so the surface of the layout is level?
IMHO I think it would almost be better to have a large base for your layout, say polestyrene, then gauge the depth out with a hotwire or similar thingum. Then, you can sink the track into the base to be level.
This won't be suitable for temporary layouts, but its just a thought I had
Is there anyway of sinking the track so the surface of the layout is level?
IMHO I think it would almost be better to have a large base for your layout, say polestyrene, then gauge the depth out with a hotwire or similar thingum. Then, you can sink the track into the base to be level.
This won't be suitable for temporary layouts, but its just a thought I had
